Annual power generation of Shuifeng Lake

The dam's reservoir has a capacity of 14,600,000,000 m 3 (11,836,413 acre⋅ft) of which 7,900,000,000 m 3 (6,404,634 acre⋅ft) is active (or "useful") for power generation. The dam sits at the head of a 52,912 km 2 (20,429 sq mi) catchment area and its reservoir has a surface area of 274 km 2 (106 sq mi).
Contact online >>

Study on Medium and Long Term Forecasting Methods for Inflow

The study will support the formulation of medium-and long-term operation plans for Shuifeng Reservoir and downstream power plants. The medium and long term forecast of runoff in

Study on Medium and Long Term Forecasting Methods for Inflow

The medium and long term forecast of runoff in areas with little data is related to the medium and long term power generation of power plants, and also has a strong guiding effect on the short

Estimation of annual energy output from a tidal barrage using two

The results indicate that the theoretical annual tidal energy resources is about 2×10 8 kWh under the influence of tidal power station; Optimized power installation is

Sihwa Lake Tidal Power Station – "The World''s Largest Tidal Power

The Sihwa Lake Tidal Power Station is the world''s largest tidal power plant, generating enough clean electricity to power over 250,000 homes. The tidal power generation plant can

ESTIMATING POWER PLANT GENERATION IN THE GLOBAL

Statistical models use information on power plants with reported annual generation to estimate the correlation between annual generation and plant characteristics such as capacity, fuel type,

About Annual power generation of Shuifeng Lake

About Annual power generation of Shuifeng Lake

The dam's reservoir has a capacity of 14,600,000,000 m 3 (11,836,413 acre⋅ft) of which 7,900,000,000 m 3 (6,404,634 acre⋅ft) is active (or "useful") for power generation. The dam sits at the head of a 52,912 km 2 (20,429 sq mi) catchment area and its reservoir has a surface area of 274 km 2 (106 sq mi).

The Sup'ung Dam (: ; : ; : 수풍댐(댐)), also referred to as the Shuifeng Dam and originally the Suihō Dam, is aon the.

• • •.

In 1937, during , the Yalu Hydroelectric Company was established and in the same year construction began on the dam, with theopening a rail line in 1939 to assist with the construction.In 1941, the dam was.

The Supung is a 106 m (348 ft) tall and 899.5 m (2,951 ft) long concrete gravity dam with a crest elevation of 126.4 m (415 ft). The dam'sconsists of 26with a maximum discharge capacity of 37,650 m /s (1,329,597 cu ft/s). An auxiliary spillway 1.7 km.The dam's reservoir has a capacity of 14,600,000,000 m 3 (11,836,413 acre⋅ft) of which 7,900,000,000 m 3 (6,404,634 acre⋅ft) is active (or "useful") for power generation. The dam sits at the head of a 52,912 km 2 (20,429 sq mi) catchment area and its reservoir has a surface area of 274 km 2 (106 sq mi).

The dam's reservoir has a capacity of 14,600,000,000 m 3 (11,836,413 acre⋅ft) of which 7,900,000,000 m 3 (6,404,634 acre⋅ft) is active (or "useful") for power generation. The dam sits at the head of a 52,912 km 2 (20,429 sq mi) catchment area and its reservoir has a surface area of 274 km 2 (106 sq mi).

Shuifeng hydroelectric plant () is an operating hydroelectric power plant on the border of Liaoning, China and North Pyongan, North Korea.

The study will support the formulation of medium-and long-term operation plans for Shuifeng Reservoir and downstream power plants. The medium and long term forecast of runoff in areas with little data is related to the medium and long term power generation of power plants, and also has a strong guiding effect on the short term economic .

Annual percentage change in solar energy generation; Annual percentage change in wind energy generation; CO₂ emissions per capita vs. fossil fuel consumption per capita; .Wind power generation; World crude oil price vs. oil consumption; Year-to-year change in primary energy consumption by source;.

The Shuifeng (Sup’ung) dam was constructed by the Japanese between 1937 and 1943 in order to generate electricity and it has been repaired and renovated multiple times — primarily due to spillway damage from flooding.

As the photovoltaic (PV) industry continues to evolve, advancements in Annual power generation of Shuifeng Lake have become critical to optimizing the utilization of renewable energy sources. From innovative battery technologies to intelligent energy management systems, these solutions are transforming the way we store and distribute solar-generated electricity.

When you're looking for the latest and most efficient Annual power generation of Shuifeng Lake for your PV project, our website offers a comprehensive selection of cutting-edge products designed to meet your specific requirements. Whether you're a renewable energy developer, utility company, or commercial enterprise looking to reduce your carbon footprint, we have the solutions to help you harness the full potential of solar energy.

By interacting with our online customer service, you'll gain a deep understanding of the various Annual power generation of Shuifeng Lake featured in our extensive catalog, such as high-efficiency storage batteries and intelligent energy management systems, and how they work together to provide a stable and reliable power supply for your PV projects.

6 FAQs about [Annual power generation of Shuifeng Lake]

Where is Shuifeng hydroelectric plant located?

Part of the Global Hydropower Tracker, a Global Energy Monitor project. Shuifeng hydroelectric plant () is an operating hydroelectric power plant on the border of Liaoning, China and North Pyongan, North Korea. Loading map...

Why was the Shuifeng Dam built?

The Shuifeng (Sup’ung) dam was constructed by the Japanese between 1937 and 1943 in order to generate electricity and it has been repaired and renovated multiple times — primarily due to spillway damage from flooding. Flooding in 1946 damaged the stilling basin at the toe of the dam and destroyed its spillway, requiring repairs the next year.

How big is Shuifeng Dam?

The Shuifeng (Sup’ung) dam is a 106 m (348 ft) tall and 899.5 m (2,951 ft) long concrete gravity dam with a crest elevation of 126.4 m (415 ft). The dam's spillway consists of 26 sluice gates with a maximum discharge capacity of 37,650 m3/s (1,329,597 cu ft/s).

Why is the Shuifeng hydropower station called?

The Shuifeng Hydropower Station is known as (or ) in Chinese and 수풍댐 in Korean2. The Shuifeng (Sup’ung) dam was constructed by the Japanese between 1937 and 1943 in order to generate electricity and it has been repaired and renovated multiple times — primarily due to spillway damage from flooding.

What is the largest hydroelectric power station on the Yalu River?

It is still the largest hydroelectric power station on the Yalu (Korean: Amnok) River. Power produced at the dam's main 630 MW power station is evenly shared between China and North Korea. The dam is featured on the national emblem of North Korea.

How much water is exchanged in Shihwa Lake?

Approximately 147 million cubic m of seawater is exchanged during these times, which makes up about the half of the entire lake. The COD level at Shihwa lake is currently at 2 ppm – from 3.7 ppm before – which is similar to that of the West Sea (Yellow Sea), indicating that its water quality is improving.

Related Contents

Contact Integrated Localized Bess Provider

Enter your inquiry details, We will reply you in 24 hours.